TIANJIN, CHINA—Airbushas commissioned the first A321 aircraft to be assembled at its Final Assembly Line Asia (FAL Tianjin) in Tianjin, China.The FAL in Tianjin officially started the adaptation work to become A321 capable in August 2022. It is the first major assembly line upgrade since operations commenced in 2008. FAL Tianjin’s first A321 aircraft is scheduled for delivery in early 2023.


Airbus has four A320 Family assembly facilities worldwide: Toulouse, France; Hamburg, Germany; Tianjin, China; and Mobile, United States. By the end of 2022, all commercial aircraft assembly sites will be A321-capable as part of a str to de-risk the ramp-up and to meet the rising share of A321 production.


Fal Tianjin于2008年开幕,是欧洲以外的第一台空客商业飞机装配线。必威教程同年,第一架飞机部分到达现场。自2009年第一次A320交付以来,Fal Tianjin在其14年的运营中已交付了600多架飞机。它已成为成功中欧合作的榜样。


A321neo是longest-fuselage member of Airbus’ best-selling, single-aisle A320 Family, comfortably seating as many as 244 passengers in a higher-density arrangement, with the longest range reaching 4,700nm/8,700km. Featuring the widest single-aisle cabin in the sky, the A320neo Family offers a 20 % reduction in fuel consumption and CO2 and a 50% noise reduction compared to previous generation aircraft, thanks to incorporating the latest technologies, including new generation engines and Sharklets. By the end of September 2022, the A320neo Family has received over 8,500 firm orders from more than 130 customers worldwide.